Dress Rehearsal:
I made a few notes in the dress rehearsal that we then tried to solve in the second run, these were-
-Most of the projections were out of line with the central line (Mr Hancock realigned the projector to centre all of them as it must of been jogged).
-We also noted for all Fat Sam's lighting state that the backdrop needed to be lowered or taken out to see the projections (this was reprogrammed for the performance).
-Mrs dLG after the dress said all the New York projections were too invasive so we only have the 1st one.
Performance:
I noticed in the performance the projections were doing a weird transition animation that made it look like it was done in Powerpoint. I have talked to Joe and hopefully it will be changed, I'll check this in my double lesson later. I will also talk to Joe about making sure he's proactive with following his script and anticipating cues as the projections should be simultaneous with the lighting cues and consistently the projections are a good 20 seconds or minutes after when the cue should be. At LX5 is when the Book Emporium projection should come up but it came up too early in Bugsy 's monologue yesterday so I'll talk to Anna about this today.
No comments:
Post a Comment